Assessment
Pre-change checks of circuits, earthing and supply arrangements.
Modernise an older fuse board, improve circuit protection and organise the installation with appropriate testing and documentation.
The existing circuits, earthing, bonding, supply arrangement and test results need to be understood before a new consumer unit is selected and installed.
A modern board can provide individual circuit protection and surge protection options, but it cannot correct every defect elsewhere in the installation. Pre-change checks help identify issues that could affect the work.
The quotation explains the intended board arrangement, included protective devices, circuit labelling, testing and any assumptions about existing circuits.
Age alone is not the only factor. Missing protection, damage, poor modifications, limited capacity or unsatisfactory test results may make an upgrade sensible.
An inspection can help distinguish between a board that is simply old and one that creates practical or safety limitations for planned work.
Send the basic details. James will review the scope and contact you about availability and the next step.
The final scope is agreed after the existing installation and your requirements are reviewed.
Pre-change checks of circuits, earthing and supply arrangements.
Individual protection for circuits where selected in the design.
Assessment and installation of surge protection where appropriate.
Clear circuit schedules and identification.
Verification of circuits connected to the new board.
Relevant certification and agreed Building Regulations route.
A clear written quotation is provided once the scope can be priced reliably. Diagnostic work may be charged separately where the fault cannot be identified in advance.
See domestic price examplesSend the property type, postcode, symptoms or required work, and useful photos.
The existing installation, access and likely testing requirements are reviewed.
A quotation, site survey or diagnostic visit is agreed before work starts.
Work is carried out carefully, then relevant checks and documentation are completed.
Check the wider condition before planning an upgrade.
View serviceInvestigate circuits that trip or behave unpredictably.
View serviceRead what to expect before the work.
View serviceMany straightforward upgrades can be completed within a day, but circuit defects, access and remedial work can extend the time.
Yes. The supply will need to be isolated for part of the work. The expected interruption is discussed in advance.
No. It improves the distribution and protective-device arrangement, but defects in the connected circuits may still need separate repair.
An RCBO provides overcurrent and residual-current protection for an individual circuit, helping avoid one fault affecting unrelated circuits.
The specification is discussed and stated in the quotation. Suitability depends on the installation and applicable requirements.
The agreed electrical certification and notification route, where applicable, are included in the scope.
Send the job details and postcode for practical advice and a free quotation.