Insured11 years’ experienceFree quotationsLondon & nearby areas
Reports, testing & diagnostics

Electrical testing and inspection in London

Condition reporting, circuit testing, fault investigation and clear remedial recommendations for domestic and smaller commercial installations.

Free quotationsLondon & surrounding areasDirect contact with James
Service overview

Testing gives you evidence—not guesswork—about an installation.

Electrical testing helps establish whether protective measures operate as intended, whether circuits have defects and whether the installation is suitable for continued use.

The exact testing depends on the purpose of the visit. An EICR is different from diagnosing a single intermittent fault, and testing a new circuit is different from inspecting an older installation.

Bastian Electrical explains the intended scope, access needs and likely limitations before the visit so the resulting information is useful.

Testing can reveal defects that were not visible beforehand. Remedial work is not automatically included in an inspection price unless the quotation says so.

Understanding limitations

An inspection cannot confirm what is inaccessible or outside the agreed scope. Locked rooms, furniture, fixed equipment and unavailable isolation can limit testing, so access should be planned in advance.

A report should be used as a decision tool. Observations are considered alongside the installation, its use and the relevant requirements rather than treated as a simple pass-or-fail label.

No-obligation enquiry

Ask about this service

Send the basic details. James will review the scope and contact you about availability and the next step.

What the service can include

Testing services matched to the reason for the inspection.

The final scope is agreed after the existing installation and your requirements are reviewed.

E

EICRs

Condition reports for landlords, owners, purchases and maintenance planning.

C

Circuit testing

Checks associated with new work, alterations and fault diagnosis.

F

Fault diagnosis

Measured investigation of tripping, leakage and continuity problems.

R

Remedial planning

Clear explanation and pricing for defects that need attention.

L

Labels & schedules

Improved circuit identification where included in the scope.

H

Handover records

Relevant documentation for agreed electrical work.

Planning the work

What is checked before work begins.

  • Purpose of the report or test.
  • Number of circuits and distribution boards.
  • Access to all areas, accessories and equipment.
  • Whether occupants or business operations limit isolation.
  • Previous reports, certificates or known defects.
  • Any agreed limitations that must be recorded.
Your quotation

What can affect the price?

  • Property size and circuit count.
  • Multiple boards, outbuildings or communal areas.
  • Access to fixed equipment and concealed points.
  • Time needed to trace unidentified circuits.
  • Occupied or operational premises.
  • Extent of reporting and remedial quotation required.

A clear written quotation is provided once the scope can be priced reliably. Diagnostic work may be charged separately where the fault cannot be identified in advance.

See domestic price examples
How it works

A clear route from enquiry to completion.

Share the details

Send the property type, postcode, symptoms or required work, and useful photos.

Assess the scope

The existing installation, access and likely testing requirements are reviewed.

Confirm the basis

A quotation, site survey or diagnostic visit is agreed before work starts.

Complete and check

Work is carried out carefully, then relevant checks and documentation are completed.

You may also need

Related electrical services

EICR certificates

Detailed information for landlords and property owners.

View service

Electrical fault finding

Diagnostic help for active electrical problems.

View service

Consumer unit upgrades

Plan protective-device improvements after assessment.

View service
Helpful answers

Questions about this service

How long does electrical testing take?

It depends on the number of circuits, access, identification and condition. A small flat may be much quicker than a larger property with multiple boards.

Will the electricity need to be switched off?

Usually, some isolation is needed for safe and meaningful testing. The likely disruption is discussed before the visit.

Is remedial work included?

Not unless specifically listed. A report or diagnostic visit can be followed by a separate quotation for agreed remedials.

Can you test an occupied rental property?

Yes, provided access and suitable arrangements are made. Tenants should know that power may be interrupted during the inspection.

What information should I provide?

The property type, approximate size, number of boards, reason for testing and any previous reports or known issues are useful.

Need help with testing and inspection?

Send the job details and postcode for practical advice and a free quotation.

Call James Free quote