Power layout
Sockets, appliance supplies and dedicated circuits.
Full and partial rewires planned around the property, finish, access and future electrical needs—not a one-size-fits-all package.
A rewire affects far more than cables. Socket positions, lighting controls, appliance supplies, data, alarms, outdoor services and the final finish all need to be planned before walls and floors are closed.
Bastian Electrical takes on carefully scoped full and partial rewires, particularly smaller homes, flats, rental refurbishments and staged projects where the programme is realistic.
Occupied rewires require more time and coordination than empty properties. The quotation states assumptions about access, furniture, floor lifting, chasing and making good.
Testing and inspection can help determine whether a full rewire is justified or whether selected circuits can be upgraded. A partial rewire may be appropriate during a kitchen, extension or room refurbishment.
Future planning is valuable. Adding sensible spare capacity and cable routes during open works can cost much less than revisiting finished areas later.
Send the basic details. James will review the scope and contact you about availability and the next step.
The final scope is agreed after the existing installation and your requirements are reviewed.
Sockets, appliance supplies and dedicated circuits.
Ceiling points, wall lights, controls and feature lighting.
Cooking, laundry, refrigeration and worktop power.
Smoke, heat and carbon-monoxide alarm wiring.
Data points, controls and future-ready cable routes.
Garden sockets, lighting and outbuilding supplies where included.
A clear written quotation is provided once the scope can be priced reliably. Diagnostic work may be charged separately where the fault cannot be identified in advance.
See domestic price examplesSend the property type, postcode, symptoms or required work, and useful photos.
The existing installation, access and likely testing requirements are reviewed.
A quotation, site survey or diagnostic visit is agreed before work starts.
Work is carried out carefully, then relevant checks and documentation are completed.
Browse smaller domestic repairs and additions.
View servicePlan distribution and protection as part of a rewire.
View serviceRead common warning signs and next steps.
View serviceIt may be possible, but it is slower and more disruptive. A realistic room-by-room programme and access plan are essential.
The programme depends on property size, occupancy, point count, routes, making good and coordination with other trades.
Only if stated. Electrical quotations often exclude final plastering, decoration and floor repairs, so responsibilities are made clear.
Not automatically. Condition, design, protective measures and test results matter more than age alone.
Yes. Standard allowances or customer-selected accessories can be agreed before pricing is finalised.
Yes, the agreed installation work is tested and the relevant documentation is provided.
Send the job details and postcode for practical advice and a free quotation.