Condition checks
Visual checks of fittings, indicators and accessible wiring.
Electrical support for emergency-lighting checks, fitting replacement, alterations and remedial work in smaller commercial and landlord-controlled premises.
Emergency lighting is intended to support safe escape when normal lighting fails. The required coverage depends on the building layout, use, escape routes and fire-risk information.
Bastian Electrical can inspect accessible equipment, replace suitable fittings, carry out defined electrical tests and install alterations where the required layout or competent design basis is available.
A simple fitting swap is different from designing an emergency-lighting system for a changed building. Responsibilities are clarified before work starts.
Send the basic details. James will review the scope and contact you about availability and the next step.
The final scope is agreed after the existing installation and your requirements are reviewed.
Visual checks of fittings, indicators and accessible wiring.
Agreed operational tests and recording.
Replace failed or obsolete suitable fittings.
Install defined additions or changes to an agreed layout.
Identify common battery or charging failures.
Quote electrical repairs identified during inspection.
A clear written quotation is provided once the scope can be priced reliably. Diagnostic work may be charged separately where the fault cannot be identified in advance.
See domestic price examplesSend the property type, postcode, symptoms or required work, and useful photos.
The existing installation, access and likely testing requirements are reviewed.
A quotation, site survey or diagnostic visit is agreed before work starts.
Work is carried out carefully, then relevant checks and documentation are completed.
Plan routine lighting and electrical repairs.
View serviceCoordinate emergency lighting during refurbishment.
View serviceDefined electrical support for suitable systems.
View serviceDefined functional and electrical checks can be agreed. The person responsible for the premises should also maintain required routine records.
Testing frequency depends on the applicable regime and premises responsibilities. The current logbook, fire-risk information and maintenance plan should be checked.
A competent design may be required. Installation can be based on suitable design information or a clearly allocated design responsibility.
Sometimes, depending on fitting design, condition and availability. Full fitting replacement may be more appropriate.
Potentially by prior agreement, subject to availability and quotation.
Electrical test documentation can be provided for agreed work; broader fire-safety certification or risk assessment is a separate responsibility.
Send the job details and postcode for practical advice and a free quotation.