Supply assessment
Review incoming supply, existing demand and available capacity.
Supply assessment, dedicated circuits, protection and enabling work for suitable home and smaller workplace electric-vehicle charging projects.
EV charging adds a sustained electrical load. The incoming supply, existing demand, earthing arrangement, cable route, charger features and network requirements need to be reviewed together.
Bastian Electrical can assess suitable projects, install defined circuits and support charger installation where the equipment, manufacturer requirements and notification responsibilities are clear.
Some installations may require supply-network involvement, load management, an approved product route or a specialist charger provider. These requirements are identified before commitment.
Send the basic details. James will review the scope and contact you about availability and the next step.
The final scope is agreed after the existing installation and your requirements are reviewed.
Review incoming supply, existing demand and available capacity.
Cable route and circuit sized for the agreed charger.
Protective devices and earthing measures appropriate to the design.
Consider compatible load-control requirements where needed.
Plan an external or internal route with suitable protection.
Electrical verification and documentation for the agreed work.
A clear written quotation is provided once the scope can be priced reliably. Diagnostic work may be charged separately where the fault cannot be identified in advance.
See domestic price examplesSend the property type, postcode, symptoms or required work, and useful photos.
The existing installation, access and likely testing requirements are reviewed.
A quotation, site survey or diagnostic visit is agreed before work starts.
Work is carried out carefully, then relevant checks and documentation are completed.
Review distribution capacity and protection.
View servicePlan weather-resistant external cable routes.
View serviceBroader electrical upgrades for the home.
View serviceMany can, but supply capacity, earthing, parking access and cable routing need assessment.
Not always. The existing board and available protective-device arrangement must be checked.
Some installations require notification or approval depending on supply and load. The applicable route should be confirmed.
Potentially, provided the product, instructions, warranty conditions and installation responsibilities are suitable.
It is a control method that limits charger demand when the property is using more electricity, helping manage the available supply.
No. Grant rules and approved-installer requirements are separate and must be checked for the specific scheme.
Send the job details and postcode for practical advice and a free quotation.