Assessment
Review existing board, supply and outgoing circuits.
Assessment, replacement and alteration of suitable commercial and light industrial distribution boards with protection, circuit data and testing considered together.
Board selection depends on supply characteristics, prospective fault current, protective devices, circuit loading, discrimination, environment and available space.
Bastian Electrical can assess and deliver suitable smaller distribution-board upgrades and defined circuit alterations where the design information and project scale are manageable.
Pre-change testing helps identify circuit defects and labelling problems that could otherwise appear during the shutdown.
Send the basic details. James will review the scope and contact you about availability and the next step.
The final scope is agreed after the existing installation and your requirements are reviewed.
Review existing board, supply and outgoing circuits.
Select suitable protective devices for the agreed design.
Add or alter defined outgoing circuits.
Clear schedules, identifiers and warning labels.
Verification of connected circuits and new work.
Agreed records, schedules and electrical documentation.
A clear written quotation is provided once the scope can be priced reliably. Diagnostic work may be charged separately where the fault cannot be identified in advance.
See domestic price examplesSend the property type, postcode, symptoms or required work, and useful photos.
The existing installation, access and likely testing requirements are reviewed.
A quotation, site survey or diagnostic visit is agreed before work starts.
Work is carried out carefully, then relevant checks and documentation are completed.
Broader commercial circuit and power work.
View serviceThree-phase circuits and supply alterations.
View servicePre-change assessment and condition information.
View servicePre-testing is strongly useful because faults or unidentified circuits can disrupt the planned change.
This depends on board size, circuit condition and work sequence. A realistic shutdown window is agreed.
Yes, where included in the design, capacity and quotation.
Clear labelling and an agreed schedule are part of a professional board upgrade.
Large or specialist switchgear may require a dedicated specialist and larger team. The enquiry will be assessed honestly.
Only defined remedials are included. Unexpected defects are explained and agreed before additional work.
Send the job details and postcode for practical advice and a free quotation.