Equipment supplies
Defined circuits for suitable three-phase loads.
Defined three-phase supplies, isolators, distribution alterations and testing for suitable commercial and light industrial equipment.
Equipment ratings, starting current, duty, cable route, protective devices and fault conditions all influence a three-phase circuit.
Bastian Electrical can install suitable smaller three-phase supplies and alterations where the design data, equipment instructions and project scale are clear.
Major switchgear, complex discrimination studies and high-capacity installations may require specialist design or a larger delivery team.
Send the basic details. James will review the scope and contact you about availability and the next step.
The final scope is agreed after the existing installation and your requirements are reviewed.
Defined circuits for suitable three-phase loads.
Appropriate isolation near agreed equipment.
Smaller board and outgoing-circuit changes.
Durable cable routes where suitable.
Phase sequence and relevant electrical verification.
Clear circuit, isolator and equipment identification.
A clear written quotation is provided once the scope can be priced reliably. Diagnostic work may be charged separately where the fault cannot be identified in advance.
See domestic price examplesSend the property type, postcode, symptoms or required work, and useful photos.
The existing installation, access and likely testing requirements are reviewed.
A quotation, site survey or diagnostic visit is agreed before work starts.
Work is carried out carefully, then relevant checks and documentation are completed.
Broader light industrial electrical support.
View serviceCommercial distribution alterations and upgrades.
View servicePower and defined control wiring for equipment.
View servicePotentially, after checking supply capacity, equipment requirements, protection and cable route.
Equipment data plate, manufacturer instructions, location, intended use and existing supply information are useful.
Electrical supply testing can be agreed, but machinery commissioning may remain with the manufacturer or specialist.
Only if the board, supply, protective devices and available capacity are suitable.
Some isolation may be needed. The shutdown requirements are planned before work.
Large or complex projects may require specialist design and a larger contractor team; the enquiry is assessed honestly.
Send the job details and postcode for practical advice and a free quotation.